Gadgetory


All Cool Mind-blowing Gadgets You Love in One Place

INCREDIBLE ROAD TECHNOLOGIES THAT ARE REALLY INSANE

2019-02-28
filling the potholes day after day road surfaces suffer from all sorts of devastating external effects unfavorable weather conditions soil affected by destructive processes as well as friction of car tires are the causes of potholes companies that build roads are forced to fix the road covering the potholes but they do not always deal with the task in time citizens often come to the rescue and sometimes choose very original and creative ways to fix Road deficiencies human imagination is limitless so there are countless creative ways to repair a pothole for example artist Jim Becker from Chicago is decided to help rate service by filling particularly large and deep gaps with mosaics first he firs each hole with mortar and then places a pattern of glass and marble on top he assembles them at home beforehand the idea of repairing the roads in this way came to the artist when he visited Pompeii the man decided that if the glass and marble roads built in ancient Rome have survived to this day and this technology is suitable for modern roads too now it's impossible to confuse his neighborhood with any other parts of the city this is because the roads are flat and the patches on the surface are a true work of art and although the artists work is technically illegal the police and road services don't mind at all so no one's going to stop and find the man trying to restrict his creative impulses infra-red pavement repair statistics show that every year between 2 and 3 percent of the surface area of each city's roads wears out in some places where the climate is particularly harsh or where low-quality materials have been used the figure can be as high as 12 to 15 percent cracks and potholes are the most common problem before starting the repair it's necessary to remove the damaged layer traditionally mini excavators with hydraulic hammers and hammers and special cutters are used for destroying the asphalt layer today there is a more efficient simple and economical way to remove the old coating thanks to the use of special equipment infrared asphalt heaters infrared heat softens the road but doesn't degrade its properties bitumen does not burn in the process not only asphalt but also concrete metal and even thermoplastic can be heated with the help of this equipment during the repair the fourth step is to place the heater over the damaged area the asphalt doesn't take more than 10 minutes to soften after that the heater Rises and moves to the next damaged area workers loosen the surface add fresh asphalt salute reminiscing agent and then level the layer the only thing left to do is roll the results is a flawless surface that doesn't look like a patch it should be noted that this form of road repair unlike traditional methods allows the amounts of materials used to be reduced by half chip Phil saveco markings as a company specialized in the production and sale of thermoplastic for road markings however a few years ago the company's experts developed a new thermoplastic that unique properties its main feature is that it's suitable for road repair in crude form chip fill looks like flakes that are transported in large bags first workers eat the damaged surface and then fill it with these flakes next the chip fill thermoplastic is heated using a gas torch the material optimally fills the crack or hole and melts with the bitumen this repair method is ideal if the damage has a diameter or width of 15 to 20 centimeters maximum thermoplastic adea's much better to the surface the materials traditionally used for cold repair the repair process takes only 20 minutes which is enough to prevent further damage to the right surface it should be noted that roads can be repaired in this way all year round as well the use of bulky and complex Road equipments is not required humm Klinger hydraulic clamps while automobile tracks are paved with asphalt slabs are increasingly used as materials for sidewalks and walkways here we have an advanced hydraulic paver laying clamps produced by the German company hum clinker each machine is equipped with a patented automatic hydraulic control unit this means that the device can be connected to any construction machine by contrast the installation of competing models which usually have an electro-hydraulic unit is much more complicated and can only work with a certain number of machines the robot operates in cycles holding a layer of slabs while the clamps perform lateral and horizontal leveling the clamps then fix the layer lifts the slabs and place them on the surface cycles are repeated over and over again until the walkway is ready concrete rollers the last step in creating a concrete floor whether indoors or outdoors is to level the surface it's especially important to perform this step when it comes to building a room only if the floor is flat laying linoleum laminates or other similar materials can be done correctly however leveling is also important when building parts creating a perfectly flat surface without joints is a complex and time-consuming job traditional leveling methods are not perfect and require a lot of effort from workers curb roll or manufacturing offers a solution that will significantly simplify and accelerate this work the company produces concrete rollers of different sizes and designs the equipment is powered by an electric generator the solid roller rolls and compresses the surface to create a perfect surface without any effort the working width of the roller can be varied so that workers can perform a wide variety of tasks poly level the most common reason the surface of the concrete slab becomes unusable is because the soil beneath it shrinks on the outside it may appear that poly level is an ordinary spray foam that shouldn't be used under these slabs however poly level is made of polyurethane and as a higher density normally in order to return the concrete slabs to their original and correct position special concrete is used however for the cavity to fill evenly it's necessary to make a large number of holes around the entire perimeter damaging the appearance of the slight the advantage of poly level foam is that it can be filled through very small holes which are virtually visible after filling and other advantages that poly level is lights were in white than traditional mix but as a higher load-bearing capacity the lifting capacity of the foam is regulated by the components of the composition ie poly levels meet the needs of any construction project the polyurethane in the composition penetrates the floor reinforcing it which prevents further shrinkage allowing the co seem to be repaired less frequently and the last advantage is the curing speed to allow the traditional mix to spread and dry it's necessary to wait from a few hours to a couple of days poly lava dries almost instantly so the surface can be used again immediately after repair hey stop being lazy it's time to use that brain of yours welcome to brain time incredible facts from the past the present and even the future the power of nature and wild animals amazing facts and unsolved mysteries you'll find all this and much more here subscribe now you won't regret it
We are a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for us to earn fees by linking to Amazon.com and affiliated sites.